Directorate of Research & Enterprise (R & E)
International Islamic University Islamabad (IIUI)
Name of Lab Inchagre/Focal Person : Engr. Shahrukh Kahn Position of Lab Inchagre/Focal Person: Lecturer
Email ID of Lab Inchagre/Focal Person: [email protected] Phone & Cell# of Lab Inchagre/Focal Person: 051-9019962, +92-345-6097061
Postal Addrss of Lab/Center: Department of civil engineering, New block, Ground floor Geotech / Soil Lab

Geotech / Soil Lab
S.No. Name of Equipment Status (Operational) Particulars of Tests Rates per Test (Rs.) Approximate time required for analysis after receipt of sample(s)
1 Electric Drying Oven Operational Moisture Content (Lab) 550 05 working Days
2 Unit Weight Test Apparatus Operational Unit Weight (Lab) 550 05 working Days
3 Sieve Sets Operational Sieve Analysis (Dry) 1400 05 working Days
4 Sieve Sets Operational Sieve Analysis (Wash) 1400 05 working Days
5 Hydrometers with Water Baths Operational Hydrometer 4500 05 working Days
6 Liquid Limit Test Appartuse and Plastic Limit Test Apparatus Operational Liquid Limit and Plastic Limit 1400 05 working Days
7 Shrinkage Limit Test Apparatus Operational Shrinkage Limit 550 05 working Days
8 Constant Head Permeameter Operational Permeability (Constant Head) 2900 05 working Days
9 Variable Head Permeameter Operational Permeability (Variable Head) 2900 05 working Days
10 Direct Shear Machine Operational Direct Shear 4500 07 working Days
11 Oedometer Operational Consolidation 7800 05 working Days
12 Specific Gravity Test Apparatus Operational Specific Gravity (Fine Grain) 1400 05 working Days
13 Specific Gravity Test Apparatus Operational Specific Gravity (Coarse Grain) 1400 05 working Days
14 Standard Proctor Test Apparatus Operational Standar Compaction (4 inch Mould) 2250 05 working Days
15 Standard Proctor Test Apparatus Operational Standar Compaction (6 inch Mould) 2900 05 working Days
16 Modified Proctor Test Apparatus Operational Modified Compaction (4 inch Mould) 2400 05 working Days
17 Modified Proctor Test Apparatus Operational Modified Compaction (6 inch Mould) 2900 05 working Days
18 CBR Test Machine Operational One Point CBR (soaked) /T-99 4800 07 working Days
19 CBR Test Machine Operational One Point CBR (Unsoaked) 3400 07 working Days
20 CBR Test Machine Operational Three Point CBR (soaked) T-193/T-99/T-180-D 8400 07 working Days
21 CBR Test Machine Operational Three Point CBR (unsoaked) 6800 07 working Days
22 CBR Test Machine Operational One Point CBR (soaked) T-180 4800 07 working Days
23 Sand Replacemnt Test Apparatus Operational Field Density Test excluding Transportation 2900 07 working Days
24 Sieve Sets Operational Coefficient of Uniformity D10, D30, D60 2900 05 working Days
25 Dynamic Cone Penetrometer Operational Dynamic Cone pentrometer Test 17500 05 working Days
26 Triaxial Test Apparatus Operational Triaxial Test 4500 07 working Days
27 Unconfined Compression Machine Operational Unconfined Test 2400 10 working Days
28 Relative Density Test Apparatus Operational Relative Density of Sand 2900 05 working Days
29 Plate Load Test Apparatus Operational Plate Load Test 74000 + Extra Charges of Transportation and Loading Requirements as
per Site
14 Working Days
30 Sieve Sets Operational Unified Classification AASHTO 2900 05 working Days
31 Small Field Test Apparatus Operational Visit of expert at site 5800 05 working Days
32 Unit Weight and FDT Test Apparatus Operational Density of Sand for Sand Cone Apparatus 1450 05 working Days
33 Casagrande’s Liquid Limit Test Apparatus Operational Bentonite (Clay) Liquid Limit 1950 05 working Days